Machinex Gateway LoginMachinex Gateway Login
Visitez nos autres divisions :

What are the electrical requirements?

The MACH CountAIner™ requires:

  • A 240V single-phase power supply
  • A wired internet connection for system communication and reporting

A 575V three-phase power supply is only required when the MACH CountAIner™ is integrated with a downstream sorting line installation used after container processing.

Final electrical specifications may vary depending on system configuration and site conditions. Detailed requirements are confirmed during the engineering and planning phase.